An integrated approach for multi-period manufacturing planning of job-shops

An integrated approach for multi-period manufacturing planning of job-shops In the present study, an integrated methodology of manufacturing planning has been formalised for a capacity constrained job-shop with consideration of capacity planning, loading, scheduling, and process plans flexibility for a given master production schedule. This study aims at generation of production schedules that are compatible with production plans developed at a higher level for feasible implementation at the shop floor. Performance of methodology is assessed for eight case studies from mean tardiness viewpoint. Results indicate that formalised integrated methodology is effective in the complex job-shop environment. Further, mean tardiness performance of integrated methodology is found better than that of the conventional hierarchical approach of manufacturing planning. [Submitted 22 December 2017; Accepted 29 September 2018] http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png International Journal of Manufacturing Research Inderscience Publishers

An integrated approach for multi-period manufacturing planning of job-shops

Loading next page...
 
/lp/inderscience-publishers/an-integrated-approach-for-multi-period-manufacturing-planning-of-job-AODaVbp5vQ

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Inderscience Publishers
Copyright
Copyright © Inderscience Enterprises Ltd
ISSN
1750-0591
eISSN
1750-0605
DOI
10.1504/IJMR.2020.106856
Publisher site
See Article on Publisher Site

Abstract

In the present study, an integrated methodology of manufacturing planning has been formalised for a capacity constrained job-shop with consideration of capacity planning, loading, scheduling, and process plans flexibility for a given master production schedule. This study aims at generation of production schedules that are compatible with production plans developed at a higher level for feasible implementation at the shop floor. Performance of methodology is assessed for eight case studies from mean tardiness viewpoint. Results indicate that formalised integrated methodology is effective in the complex job-shop environment. Further, mean tardiness performance of integrated methodology is found better than that of the conventional hierarchical approach of manufacturing planning. [Submitted 22 December 2017; Accepted 29 September 2018]

Journal

International Journal of Manufacturing ResearchInderscience Publishers

Published: Jan 1, 2020