Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times

An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with... In this article, we address the m-machine no-wait flow shop scheduling problem with sequence dependent setup times. The objective is to minimize total tardiness subject to an upper bound on makespan. Although these constraints and performance measures have all been extensively studied independently, they have never been considered together in this problem before. So, this multi-criteria approach provides more realistic solutions for complex scenarios. To solve the problem, we developed a new heuristic called IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document}. The proposed method repeatedly performs a process of destruction and construction of an existing solution in order to improve it. The novelty of this method includes a mechanism capable of adapting the destruction intensity according to the instance size and the number of iterations, calibrating the algorithm during the search. Computational experiments indicate that IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document} outperforms the best literature method for similar applications in overall solution quality by about 35%. Therefore, IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document} is recommended to solve the problem. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png 4OR Springer Journals

An efficient iterated greedy algorithm for a multi-objective no-wait flow shop problem with sequence dependent setup times

4OR , Volume OnlineFirst – Mar 10, 2023

Loading next page...
 
/lp/springer-journals/an-efficient-iterated-greedy-algorithm-for-a-multi-objective-no-wait-ub2h00qTC9
Publisher
Springer Journals
Copyright
Copyright © The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature 2023. Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
ISSN
1619-4500
eISSN
1614-2411
DOI
10.1007/s10288-023-00535-7
Publisher site
See Article on Publisher Site

Abstract

In this article, we address the m-machine no-wait flow shop scheduling problem with sequence dependent setup times. The objective is to minimize total tardiness subject to an upper bound on makespan. Although these constraints and performance measures have all been extensively studied independently, they have never been considered together in this problem before. So, this multi-criteria approach provides more realistic solutions for complex scenarios. To solve the problem, we developed a new heuristic called IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document}. The proposed method repeatedly performs a process of destruction and construction of an existing solution in order to improve it. The novelty of this method includes a mechanism capable of adapting the destruction intensity according to the instance size and the number of iterations, calibrating the algorithm during the search. Computational experiments indicate that IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document} outperforms the best literature method for similar applications in overall solution quality by about 35%. Therefore, IGA\documentclass[12pt]{minimal}\usepackage{amsmath}\usepackage{wasysym}\usepackage{amsfonts}\usepackage{amssymb}\usepackage{amsbsy}\usepackage{mathrsfs}\usepackage{upgreek}\setlength{\oddsidemargin}{-69pt}\begin{document}$$IG_{A}$$\end{document} is recommended to solve the problem.

Journal

4ORSpringer Journals

Published: Mar 10, 2023

Keywords: Iterated greedy; Flow shop; No-wait; Sequence-dependent setup; Total tardiness; Makespan; 68T20; 90C59