Access the full text.
Sign up today, get DeepDyve free for 14 days.
Bing Li, Xingsheng Gu (2006)
Grey Chance Constrained Programming for Finite Intermediate Storage Flow Shop Scheduling under Uncertainty2006 6th World Congress on Intelligent Control and Automation, 1
M. Zadeh, Yalda Katebi, A. Doniavi (2018)
A heuristic model for dynamic flexible job shop scheduling problem considering variable processing timesInternational Journal of Production Research, 57
M. Sakawa, Tetsuya Mori (1999)
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedateComputers & Industrial Engineering, 36
B Giffler (1960)
487Oper Res, 8
Dirk Sudholt, C. Witt (2010)
Runtime analysis of a binary particle swarm optimizerTheor. Comput. Sci., 411
Zhao Bao-hua (2007)
Hybrid heuristics based on particle swarm optimization and variableneighborhood search for Job Shop schedulingComputer Integrated Manufacturing Systems
Rui Li, Wenyin Gong, Chao Lu (2022)
A reinforcement learning based RMOEA/D for bi-objective fuzzy flexible job shop schedulingExpert Syst. Appl., 203
Wu Xiuli, Peng Junjian, Xie Zirun, Zhao Ning, Wu Shaomin (2021)
An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batchesJournal of Systems Engineering and Electronics, 32
Jun-qing Li, Zhengmin Liu, Chengdong Li, Zhi-xin Zheng (2021)
Improved Artificial Immune System Algorithm for Type-2 Fuzzy Flexible Job Shop Scheduling ProblemIEEE Transactions on Fuzzy Systems, 29
Wang Cuiyu, Li Yang, L. Xinyu (2021)
Solving flexible job shop scheduling problem by a multi-swarm collaborative genetic algorithmJournal of Systems Engineering and Electronics, 32
王琴, 徐文星, 边卫斌, 王万红, 董轶群 (2017)
Improved GA and global random machine selection based on the key operation to solve FJSP
(2015)
Integrated planning and scheduling under production uncertainties: Bi-level model formulation and hybrid solution method
Yi Zhang, Haihua Zhu, D. Tang (2019)
An improved hybrid particle swarm optimization for multi-objective flexible job-shop scheduling problemKybernetes, 49
B. Giffler, G. Thompson (1960)
Algorithms for Solving Production-Scheduling ProblemsOperations Research, 8
Zhenwei Zhu, Xionghui Zhou (2021)
A multi-objective multi-micro-swarm leadership hierarchy-based optimizer for uncertain flexible job shop scheduling problem with job precedence constraintsExpert Syst. Appl., 182
Haojie Ding, Xingsheng Gu (2020)
Improved particle swarm optimization algorithm based novel encoding and decoding schemes for flexible job shop scheduling problemComput. Oper. Res., 121
K. Gao, P. Suganthan, Q. Pan, T. Chua, T. Cai, C. Chong (2016)
Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectivesJournal of Intelligent Manufacturing, 27
SM Johnson (1954)
61Nav Res Logist Q, 1
P. Brucker, R. Schlie (1991)
Job-shop scheduling with multi-purpose machinesComputing, 45
Nai-ming Xie, Nanlei Chen (2018)
Flexible job shop scheduling problem with interval grey processing timeAppl. Soft Comput., 70
E. Aarts, P. Laarhoven, J. Lenstra, N. Ulder (1994)
A Computational Study of Local Search Algorithms for Job Shop SchedulingINFORMS J. Comput., 6
P. Brandimarte (1993)
Routing and scheduling in a flexible job shop by tabu searchAnnals of Operations Research, 41
Bor-Wen Cheng, Chun-Lang Chang (2007)
A study on flowshop scheduling problem combining Taguchi experimental design and genetic algorithmExpert Syst. Appl., 32
H. Ishii, M. Tada (1995)
Single machine scheduling problem with fuzzy precedence relationEuropean Journal of Operational Research, 87
E. Tirkolaee, Ali Torkayesh (2022)
A Cluster-based Stratified Hybrid Decision Support Model under Uncertainty: Sustainable Healthcare Landfill Location SelectionApplied Intelligence (Dordrecht, Netherlands), 52
W. Cui, Xiaohong Li, Shaobing Zhou, J. Weng (2007)
Investigation on process parameters of electrospinning system through orthogonal experimental designJournal of Applied Polymer Science, 103
EHL Aarts, PJM van Laarhoven, JK Lenstra (1994)
A computational study of local search algorithms for job shop schedulingORSA J Comput, 6
K. Gao, P. Suganthan, Q. Pan, T. Chua, C. Chong, T. Cai (2016)
An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing timeExpert Syst. Appl., 65
B. Zeng, Sifeng Liu, Nai-ming Xie (2010)
Prediction Model of Interval Grey Number Based on DGM (1,1)Journal of Systems Engineering and Electronics, 21
Zixiao Pan, Deming Lei, Ling Wang (2022)
A Bi-Population Evolutionary Algorithm With Feedback for Energy-Efficient Fuzzy Flexible Job Shop SchedulingIEEE Transactions on Systems, Man, and Cybernetics: Systems, 52
D. Shi, B. Zhang, Y. Li (2020)
A Multi-Objective Flexible Job-Shop Scheduling Model Based on Fuzzy Theory and Immune Genetic AlgorithmInternational Journal of Simulation Modelling, 19
Zhenwei Zhu, Xionghui Zhou (2020)
Flexible job-shop scheduling problem with job precedence constraints and interval grey processing timeComput. Ind. Eng., 149
T. Garcez, Helder Cavalcanti, A. Almeida (2021)
A hybrid decision support model using Grey Relational Analysis and the Additive-Veto Model for solving multicriteria decision-making problems: an approach to supplier selectionAnnals of Operations Research, 304
Thitipong Jamrus, Chen-Fu Chien, M. Gen, Kanchana Sethanan (2018)
Hybrid Particle Swarm Optimization Combined With Genetic Operators for Flexible Job-Shop Scheduling Under Uncertain Processing Time for Semiconductor ManufacturingIEEE Transactions on Semiconductor Manufacturing, 31
R. Nakano, T. Yamada (1991)
Conventional Genetic Algorithm for Job Shop Problems
Y Chu (2015)
255Comput Chem Eng, 72
M. Laguna, J. Barnes, F. Glover (1991)
Tabu search methods for a single machine scheduling problemJournal of Intelligent Manufacturing, 2
J. Palacios, I. Rodríguez, C. Vela, Jorge Puente (2017)
Robust multiobjective optimisation for fuzzy job shop problemsAppl. Soft Comput., 56
S. Johnson (1954)
Optimal two- and three-stage production schedules with setup times includedNaval Research Logistics Quarterly, 1
M. Gen, Lin Lin, H. Ohwada (2021)
Advances in Hybrid Evolutionary Algorithms for Fuzzy Flexible Job-shop Scheduling: State-of-the-Art Survey
(2018)
Process planning technology of mechanical machining system for generalized energy efficiency
S. Cook (1971)
The complexity of theorem-proving proceduresProceedings of the third annual ACM symposium on Theory of computing
Lin Yao, Yabin Liu, Houbao Zhao, Haojie Ding (2019)
An improved UKPK-PSO algorithm inspired from block chain technology for flexible job shop scheduling problem2019 Chinese Control Conference (CCC)
J. Deng (1982)
Control problems of grey systemsSystems & Control Letters, 1
With the complexity of industrial products, the processing time of products is affected by many factors, and it is difficult to give a concrete time estimate. Therefore, it is significant to study the flexible job shop scheduling problem (FJSP) with uncertain processing time. This paper defines the uncertain processing time as the interval grey processing time (IGPT). Also, an FJSP model with IGPT (G-FJSP) is formulated to minimize the interval grey maximum completion time, and the mathematical operation rules of IGPT are improved. Based on this, a step-size adaptive discrete particle swarm algorithm with load balancing (LS-DPSO) is put forward to solve the G-FJSP model. The experimental analysis on six classical test cases indicates that LS-DPSO outperforms four algorithms proposed in recent literature in terms of speed and solution quality. Taking IMK05 as an example, the minimum and the average values of LS-DPSO IGPT are 1.8% and 2.2% smaller than the optimal results of other four algorithms. Also, the resulting grey Gantt chart has better processing time flexibility to guide practical production.
Applied Intelligence – Springer Journals
Published: Jun 1, 2023
Keywords: Flexible job shop scheduling problem; Uncertainty modeling; Initialization; DPSO algorithm; Interval grey processing time
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.