Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

New Frontiers in Engineering Geology and the EnvironmentNumerical Study on the Full-Range Consolidation Characteristics of a New Dredger Fill Foundation

New Frontiers in Engineering Geology and the Environment: Numerical Study on the Full-Range... [Basing on the foundation treatment project of the beach area of Baosteel and considering the effect of dredger fill and miscellaneous fill on the consolidation behavior, the whole consolidation process of the foundation was studied with Plaxis program, and the results were validated by the monitor data. It is concluded that the excess pore pressure (EPP) of the underlying soft soil has not been dissipated completely before the foundation treatment, so the negative EPP value is caused in the following monitoring. Early settlement is mainly composed of the transient settlement due to the poor permeability of the foundation. In addition, early settlement is mainly consisted of the upper dredger fill, and there is an apparent deformation in the underlying stratum after inserting PVDs and preloading. The results are significant not only for understanding the consolidation history of new dredger fill foundation, but also for post-processing and monitoring work.] http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png

New Frontiers in Engineering Geology and the EnvironmentNumerical Study on the Full-Range Consolidation Characteristics of a New Dredger Fill Foundation

Part of the Springer Geology Book Series
Editors: Huang, Yu; Wu, Faquan; Shi, Zhenming; Ye, Bin

Loading next page...
 
/lp/springer-journals/new-frontiers-in-engineering-geology-and-the-environment-numerical-Gbpmi0xiXu

References (4)

Publisher
Springer Berlin Heidelberg
Copyright
© Springer-Verlag Berlin Heidelberg 2013
ISBN
978-3-642-31670-8
Pages
83 –87
DOI
10.1007/978-3-642-31671-5_13
Publisher site
See Chapter on Publisher Site

Abstract

[Basing on the foundation treatment project of the beach area of Baosteel and considering the effect of dredger fill and miscellaneous fill on the consolidation behavior, the whole consolidation process of the foundation was studied with Plaxis program, and the results were validated by the monitor data. It is concluded that the excess pore pressure (EPP) of the underlying soft soil has not been dissipated completely before the foundation treatment, so the negative EPP value is caused in the following monitoring. Early settlement is mainly composed of the transient settlement due to the poor permeability of the foundation. In addition, early settlement is mainly consisted of the upper dredger fill, and there is an apparent deformation in the underlying stratum after inserting PVDs and preloading. The results are significant not only for understanding the consolidation history of new dredger fill foundation, but also for post-processing and monitoring work.]

Published: Jun 11, 2012

Keywords: Dredger fill; Preloading; Soft soil; Consolidation characteristics

There are no references for this article.