Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Statistical methods applied to construction process management

Statistical methods applied to construction process management The goal of production management in construction processes is to increase competitive ability by reducing construction costs. By monitoring labor productivity using statistical methods, we can reduce real labor costs and administrative and production overheads by meeting or minimizing the construction schedule. The CONTEC automated system for preparing and managing construction processes combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes and labor required for certain production in person-hours. These are expressed with the aid of statistical terminology, mean values and standard deviations. From these statistical analyses, the measures for complying with the construction schedule can then be determined, both in terms of establishing the required number of personnel and in determining and applying the changes to the technological design of the building structures. This can then assist in accelerating the progress of construction. This study statistically analyses the categories of work where labor comprises the largest proportion of costs, the greatest demand being on the total number of personnel required to complete the work critical to the progress of construction and according to its schedule. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png "Asian Journal of Civil Engineering" Springer Journals

Statistical methods applied to construction process management

Loading next page...
 
/lp/springer-journals/statistical-methods-applied-to-construction-process-management-Unq2dOTS0n
Publisher
Springer Journals
Copyright
Copyright © Springer Nature Switzerland AG 2020
ISSN
1563-0854
eISSN
2522-011X
DOI
10.1007/s42107-020-00221-7
Publisher site
See Article on Publisher Site

Abstract

The goal of production management in construction processes is to increase competitive ability by reducing construction costs. By monitoring labor productivity using statistical methods, we can reduce real labor costs and administrative and production overheads by meeting or minimizing the construction schedule. The CONTEC automated system for preparing and managing construction processes combined with statistical methods assists in predicting the amount of time required to complete construction works according to the specified number of deployed work crews, technological processes and labor required for certain production in person-hours. These are expressed with the aid of statistical terminology, mean values and standard deviations. From these statistical analyses, the measures for complying with the construction schedule can then be determined, both in terms of establishing the required number of personnel and in determining and applying the changes to the technological design of the building structures. This can then assist in accelerating the progress of construction. This study statistically analyses the categories of work where labor comprises the largest proportion of costs, the greatest demand being on the total number of personnel required to complete the work critical to the progress of construction and according to its schedule.

Journal

"Asian Journal of Civil Engineering"Springer Journals

Published: Apr 5, 2020

There are no references for this article.